Maintenance and operation of the screw feed conveyor

05-07-2019ZGS vibrating screen

  1) This machine is operating and maintenance personnel must be aware of the specification and the engine performance and structure.

  2) Before starting the machine must check all parts of lubrication, and the lubricating oil according to the request.

  3) At run time, are not allowed to work overload.

  4) At run time, do not have large objects (such as ball mill ball and other large material) into the classifier.

  5) Parking should be to stop feeding, the groove material removal clean after downtime. If suddenly stopped, just be spiral lift.

  6) Lifting screw, the following end vanes have left level, should stop screw rotation, such as the lower blade was decreased when the contact surface should be rotating spiral, will put in place a spiral.

  7) During working hours must pay attention:

  A、 Grease cup grease should be full, every 8 hours, the oiler s 2-3.

  B、 Pressure oil at any time to add more dilute butter, such as butter is dry, oil and butter mixed with available.

  C、 Notice the speed reducer oil is oil line.

  D、 New machine in 24 hours of continuous operation, must be on the reducer and clean thoroughly, and filling the new lubricating oil, second cleaning can be in a first cleaning after 4-5 days.

  8) Spiral of lower supporting seats must be inspected regularly, if damage to the timely replacement.

  9) Spiral blade wear should be replaced.

Say hello.

We would love to learn about your project.

formarrow